| Who regulates | <cite index="28-5,28-6">About 40 counties are TCEQ authorized agents that permit locally, and the other 214 counties go through one of TCEQ's 16 regional offices.</cite> This figure comes from a secondary source and I did not confirm it on a TCEQ page. | septicandwell.com |
| Permit required | <cite index="1-1">A person must hold a permit and an approved plan to construct, alter, repair, extend, or operate an on-site sewage disposal facility.</cite> | tceq.texas.gov |
| Repairs and replacements | <cite index="1-10">An existing OSSF, whatever its installation date, needs a permit under 30 TAC 285.3 if a tank must be replaced or a drainfield repaired or replaced.</cite> | tceq.texas.gov |
| Grandfathered systems (county example) | <cite index="4-3">Bosque County says a permit is required for all systems unless the system was installed before September 1, 1989.</cite> | bosquecounty.gov |
| 10-acre exemption | <cite index="6-12">Single-family homes on 10 or more acres may be exempt from the standard OSSF permitting process but still need a site evaluation by a licensed professional.</cite> <cite index="23-10">The TCEQ rule text I found refers to a condition that all parts of the OSSF be at least 100 feet from the property line.</cite> The full exemption conditions need checking in 30 TAC 285.3. | texassepticguide.com |
| Inspection at sale (state level) | <cite index="1-11,1-12">Your mortgage company may require an OSSF evaluation before the sale closes, but TCEQ neither requires nor regulates that evaluation.</cite> | tceq.texas.gov |
| Seller disclosure | <cite index="24-5">Texas does not require a septic inspection at sale, but a residential seller must disclose any OSSF on the standard Seller's Disclosure Notice, with the supplemental on-site sewer facility form attached.</cite> This comes from a non-official source. | septicroster.com |
| Local inspection at sale | <cite index="21-3">Wichita Falls requires the seller to pay an inspection fee and have a licensed designated representative of the health district inspect the OSSF within 60 days before a sale or transfer.</cite> Check your own county or city for a similar rule. | ecode360.com |
| New owner | <cite index="1-13">After you buy a home with an OSSF, notify the local permitting authority that you are the new owner and ask about proper startup procedures.</cite> | tceq.texas.gov |
| Setbacks | <cite index="25-2,25-3">Per a secondary summary of 30 TAC §285.91(10) Table X, a septic tank must be at least 5 feet from a property line or building and 50 feet from a private well, and a standard drain field needs 5 feet from the property line, 100 feet from a private well and 150 feet from a public water well.</cite> I did not verify these distances against the official TAC table, so check Chapter 285 and your county before siting anything. | nearbyseptic.com |
| Pumping | <cite index="1-8">TCEQ advises having your tank pumped and cleaned by a TCEQ registered sludge hauler.</cite> I found no official statewide pumping interval, and the 3–5 year figure in some sources is only a recommendation. | tceq.texas.gov |
| Maintenance contracts (aerobic and other non-standard systems) | <cite index="16-3,16-4">The maintenance contract must be with a licensed maintenance provider, who is an individual person.</cite> <cite index="4-4">Bosque County, for example, requires every system other than a standard treatment tank to have a current maintenance contract on file with the county.</cite> | tceq.texas.gov |
| Inspection frequency for aerobic systems | <cite index="20-1">A Van Zandt County application says systems subject to 30 TAC 285.94(12) must be inspected once every four months.</cite> <cite index="38-4">A secondary source says the initial maintenance contract must cover at least two years from installation.</cite> | newtools.cira.state.tx.us |
| Homeowner maintenance | <cite index="2-1">Two years after the initial installation of an aerobic treatment unit, homeowners can do maintenance on systems using secondary treatment, non-standard treatment, drip irrigation or surface application.</cite> <cite index="2-3">Some permitting authorities have stricter rules that require homeowner training or prohibit homeowner maintenance.</cite> | tceq.texas.gov |
| Permit transfer on sale | <cite index="20-6">One county application says the owner must request a transfer of the permit to the buyer on sale, and a new signed maintenance contract must reach the permitting authority within 30 days.</cite> Rules differ by county. | newtools.cira.state.tx.us |
| Sensitive areas | <cite index="24-3">Areas such as the Edwards Aquifer Recharge Zone carry stricter lot-size and setback rules under 30 TAC 285.40 and Chapter 213.</cite> | septicroster.com |