| Who regulates | ODH regulates sewage treatment systems under ORC Chapter 3718 and OAC Chapter 3701-29 (effective Jan. 1, 2015), while permitting, inspections and enforcement are done by local health districts, which may adopt more stringent rules. | odh.ohio.gov |
| Permit required | No one may install a new or replacement system, or alter an existing one, without an installation or alteration permit from the board of health, and the work must be done by a registered installer. | codes.ohio.gov |
| Permit contents and validity | A permit package includes the application and fee, an approved site review, and proof of Ohio EPA Class V injection well registration if applicable; one sample county permit form (Wayne County) says the permit is valid for one year from issue. | wayne-health.org |
| Contractor registration | Installers, service providers and septage haulers must register with each local health district where they work, with a separate registration for each category of work, before starting work. | odh.ohio.gov |
| Contractor requirements | A registration application must include proof of passing the ODH-established test for the category, and the contractor must carry a surety bond (the bond form is sent to ODH); a sample county page also lists annual registration, continuing education and liability insurance. | codes.ohio.gov |
| Setbacks (official rule) | OAC 3701-29-06 requires all system components to be at least 10 feet from utility service lines, roads, driveways, property lines or right-of-way boundaries, properly sealed wells, buildings, easements, intermittent streams, swales, irrigation lines and similar features. The official text I retrieved did not show the setback to an active private water well, though secondary websites give 50 feet, so confirm that figure with your health district. | codes.ohio.gov |
| Soil separation | The rule text sets a minimum vertical separation of 18 inches and a minimum of 8 inches of unsaturated in situ soil within the infiltrative distance to all limiting conditions. | codes.ohio.gov |
| Inspection at property sale | I found no single statewide point-of-sale inspection rule in the official sources. Boards of health may require inspection at transfer, so it varies by district; for example, Broadview Heights ordinance requires a County Board of Health Certificate of Septic System Evaluation before a sale agreement, and Cuyahoga County charges $350 for the evaluation per a village notice. | codelibrary.amlegal.com |
| Operation and maintenance / pumping | Under OAC 3701-29-19, local boards of health run operation and maintenance programs (one county says all systems installed after Jan. 1, 2015 are in the program), and pumpers must file a pumping report on the uniform ODH form; I did not find a fixed statewide pumping interval in the sources. | vintonohhealth.org |
| Approved products and discharging systems | ODH keeps the list of approved pretreatment components, and Ohio EPA's household NPDES general permit OHK000004 for off-lot discharging systems is stated to expire Dec. 31, 2026, with coverage for all homes ending then. | epa.ohio.gov |