| Who regulates | The ADH Onsite Wastewater program sets statewide policy and supports Environmental Health Specialists in local health units. It reviews permit applications for systems under 1,500 gallons per day (gpd), and systems of 1,500 gpd or more are reviewed by the Division of Environmental Quality. | healthy.arkansas.gov |
| Governing rules | The State Board of Health adopted the Rules Pertaining to Onsite Wastewater Systems under Act 96 of 1913 (A.C.A. 20-7-109) and Act 402 of 1977. They set minimum standards for the design and construction of onsite systems. | law.cornell.edu |
| Permits required | Permits for construction and operation must be obtained before any onsite wastewater system is constructed, installed, or modified. | healthy.arkansas.gov |
| Permit validity | A Permit for Construction is valid for one year from the date of approval, and a permit older than one year must be revalidated before any construction starts. | healthy.arkansas.gov |
| How to apply / records | To get a permit or a copy of an existing septic permit, call the health unit in the county where the property is located and ask for the Onsite Environmental Specialist. The specialist can give you a list of private individuals licensed to do soil tests and design systems. | healthy.arkansas.gov |
| Permit exemption | A letter stating that a property is exempt from the permit requirement can be obtained from the local Health Unit. An ADH training document also mentions a 'Ten Acre Exemption' with a 200-foot setback from boundaries, which it says does not apply to ADEQ requirements. I did not find the full conditions in the sources. | healthy.arkansas.gov |
| Surface-discharge systems | Systems that discharge to the surface (for example ATU, PMF, or sand filter systems) need an ADEQ ARG550000 permit. | healthy.arkansas.gov |
| Setbacks (ADH installer training) | Minimum setbacks listed are 100 feet from a domestic water well, 100 feet from the high-water mark of streams and lakes, and 10 feet from dwellings. The setback is 300 feet from the high-water mark of lakes within one-quarter mile of a water supply intake structure. | healthy.arkansas.gov |
| Tank standards | Septic tanks must be watertight and approved by the Department. They must be made by a licensed septic tank manufacturer, and the ADH training material calls for risers over both the inlet and outlet. | healthy.arkansas.gov |
| Tank access | Septic tanks must be located so that cleaning trucks can get within a reasonable vertical and horizontal distance of the tank. | arkleg.state.ar.us |
| Abandoned tanks | Septic tanks no longer in use must be pumped out by a licensed septic tank cleaner and collapsed (the rule text is truncated in the source I retrieved). | healthy.arkansas.gov |
| Pumping / maintenance | Anyone cleaning or pumping septic tanks, holding tanks, or portable toilets for compensation must hold an ADH Septic Tank Cleaner License. I found no official statewide required pumping interval for ordinary homeowner systems. Systems in the Onsite Monitoring Program need a contract with a certified maintenance provider. | healthy.arkansas.gov |
| Inspection at property sale | I found no official ADH rule requiring a septic inspection at property sale. One non-official guide says there is no statewide mandate, so confirm with the county health unit. Rules do allow the Department or its Authorized Agent to inspect installations. | septictankhub.com |
| Plumbing connection | The ADH installer training says the house-to-tank inlet connection must be done by a licensed plumber (a Water and Sewer Service Line Installer license through ADH Plumbing). House sewer lines must follow the Arkansas Plumbing Code. | healthy.arkansas.gov |