Find your city

Type your city or ZIP code to see the best-rated septic service companies near you.

Get free quotes

Septic Tank Services in Georgia

The best-rated septic service companies across Georgia, plus state laws, permits and costs.

Looking for a septic tank Georgia provider? Georgia homeowners rely on on-site systems across many rural and suburban areas, and the right service depends on the work you need, your county, and what the rules require. This page covers top-rated companies, the state framework behind septic work, and what common services typically cost.

45 cities128 companiesavg. 4.9★

Top 10 septic service companies in Georgia

The companies below hold five-star ratings across the directory. Review counts vary widely, so check each provider's services and location against your own project before you call.

Show map

S&S Septic Services

5.0 (1,259) Gainesville, GA 24/7

Customers consistently praise fast arrival, including emergency calls, and technicians who explain each step and how to care for the system afterward. Reviewers also mention fair pricing and a helpful front office.

  • Fast response
  • Emergency service
  • Clear explanations

Services:PumpingServiceRepair

Contact See reviews Best in Gainesville →

Right Price Plumbing and Septic

5.0 (877) Stonecrest, GA

Customers consistently praise the technicians for being knowledgeable, patient, and easy to talk to, with work finished on time and clean-up left neat. Reviewers also appreciate fair pricing and the fact that the team stuck with a difficult job until it was resolved.

  • Prompt service
  • Knowledgeable techs
  • Fair pricing

Services:ServicePumpingRiser Installation

Contact See reviews Best in Stonecrest →

Georgia Septic Tank Laws & Requirements

Septic work in Georgia is governed by a state rule and enforced locally. Knowing which agency oversees your project helps you avoid delays.

Who regulates it Georgia Department of Public Health (DPH), Environmental Health Section, with enforcement by County Boards of Health

Permitting and enforcement are carried out through the county board of health, but the regulations are assigned to the Department of Public Health. The governing rule is DPH Chapter 511-3-1 and its Manual for On-Site Sewage Management Systems. I found no statewide requirement for a septic inspection at property sale.

1

Georgia Septic Tank Laws

Septic systems in Georgia are regulated by the Georgia Department of Public Health (DPH), Environmental Health Section, with enforcement carried out by County Boards of Health. The governing rule is DPH Chapter 511-3-1 and its Manual for On-Site Sewage Management Systems. Permitting happens at the county level, so the local health department is your first point of contact for any installation, repair or replacement.

2

Georgia Septic Tank Requirements

Before you build on a lot that will use septic, or install or repair a system, you need a construction permit from the county health department. Permits are issued only after a site inspection shows acceptable soil, absorption rates and groundwater conditions, and they remain valid for no more than twelve months. A final inspection is required before the system is backfilled or put into use. Where a public sewer line is available within 200 feet of the property line, connection may be required.

3

Georgia Septic Code

The code sets minimum distances for tanks and absorption fields, including setbacks from wells, property lines and buildings. It also requires an approved filter on the tank outlet and a septage removal permit for anyone pumping tank contents. Pumpers must display their firm name and permit number on both sides of each vehicle. Confirm current setback distances with your county office, since the manual has been revised over time.

Key rules at a glance (15), with official sources
TopicRuleSource
Who regulates<cite index="9-3">DPH's Environmental Health section regulates on-site sewage management systems under Rules of the Georgia Department of Public Health, Chapter 511-3-1</cite>, and <cite index="9-5">159 county health departments act as the local permitting authority.</cite>rules.sos.ga.gov
Permit required before work<cite index="11-4">No one may begin physical development of a lot or structure that will use a septic system, or install a system or component, without first getting a construction permit from the County Health Department.</cite>law.cornell.edu
Permit validity<cite index="12-3">Construction permits remain valid for no more than twelve months from the date of issue.</cite>rules.sos.ga.gov
Site/soil approval<cite index="6-3">Permits are issued only after a County Board of Health site inspection shows favorable findings on absorption rates, soil, groundwater, rock and other factors.</cite> <cite index="38-8">Permits for conventional or chamber systems are denied where bedrock or other impervious strata are less than two feet below the bottom of the proposed absorption field.</cite>dph.georgia.gov
Final inspection before backfill<cite index="10-5">No person may backfill or use a septic system until a final inspection has been done.</cite>dph.georgia.gov
Sewer connection<cite index="13-6">Connection must be made to a public or community sewage treatment system if one is available within 200 feet of the property line</cite> (2014 county-adopted copy of the state rule). <cite index="12-1">A failing residential system under 2,000 gallons per day may be exempted from connecting to sewer if the repair or replacement meets Manual criteria and has sufficient area and usable soils.</cite>cobbanddouglaspublichealth.com
Tank setbacks<cite index="38-3">The March 2026 DPH manual says a septic tank may not be less than 50 ft from boreholes, lakes, ponds, streams, watercourses and other impoundments, less than 10 ft from pressure water supply lines, or less than 10 ft from a property line.</cite> An older DPH-rule copy listed <cite index="42-5">50 ft from wells/springs and 25 ft from lakes, ponds and streams</cite>, so confirm the current distance with your county office.dph.georgia.gov
Absorption field setbacks<cite index="38-6">An absorption field may not be built less than 100 ft from wells, and less than 5 ft from buildings without basements, other structures, drives, hardscape and property lines.</cite> The 100 ft figure is from the truncated manual text and is confirmed by the exam study guide. <cite index="41-9">The manual adds that where individual water supplies serve the properties, the field must be at least 50 ft from property lines.</cite> That last item comes from a contractor website summarizing the manual, not an official source.dph.georgia.gov
Tank design<cite index="5-3,5-4">An approved filter must be installed on the tank outlet, and tank capacity must be increased by 50% if a garbage grinder is used.</cite>rules.sos.ga.gov
Pumping/septage removal<cite index="5-5">No one may remove or dispose of septic tank contents without a septage removal permit issued by the County Board of Health.</cite> <cite index="5-6">The firm name and permit number must be lettered on both sides of each septage vehicle.</cite>rules.sos.ga.gov
Pumping scheduleI found no official DPH source setting a mandatory pumping interval. A secondary source says <cite index="36-9">Georgia does not mandate a specific pumping schedule for homeowners</cite> and <cite index="36-11">cites the EPA recommendation of inspection every 1–3 years and pumping every 3–5 years.</cite>septictankhub.com
Operation/additives<cite index="10-8">No strong bases, acids or organic solvents may be used in the operation of a septic system.</cite> <cite index="6-9">Unapproved discharge or spillage of sewage is prohibited.</cite>dph.georgia.gov
Inspection at property saleI found no official state or county rule requiring a septic inspection at sale. Secondary sources say <cite index="32-5">Georgia has no statewide law requiring a septic inspection on property transfers</cite>, but <cite index="35-2">FHA, VA and most conventional lenders require proof of a functioning system.</cite>septicandwell.com
Large systems<cite index="11-9">If a proposed system will produce more than 2,000 gallons per day of sewage flow, plans, specifications, soil data and absorption test data must be submitted to the County Board of Health to obtain a construction permit.</cite>law.cornell.edu
Approved tanks<cite index="5-2">Anyone seeking approval of septic tanks for use in on-site systems must submit detailed plans and specifications for tank manufacture to the Department.</cite> I did not find a consolidated public list of approved tank models in these results. Ask DPH or your county environmental health office.rules.sos.ga.gov

Official sources:Georgia DPH – Onsite Sewage (agency page, certified contractor lists)Georgia Rules & Regulations – Subject 511-3-1 On-Site Sewage Management SystemsGa. Comp. R. & Regs. 511-3-1-.03 General Requirements (Cornell LII)DPH Manual for On-Site Sewage Management Systems (March 2026 version)DPH Manual – Section N, certification of installers/pumpersDPH Rules Chapter 511-3-1 (Jan 2016)

Rules change and some counties add their own. Check with your county health department before you start work.

Septic Tank permits and licenses in Georgia

A construction permit from your County Board of Health is the starting point for most septic projects in Georgia. The county evaluates the site and soil before approving the design, so expect a site visit before work begins. Once installation is complete, a final inspection must be passed before the system is backfilled or used. Pumping companies also need a septage removal permit to haul tank contents. Fees and local procedures vary by county, so ask your county health office for current amounts and timelines before scheduling work.

How much does septic tank pumping cost in Georgia?

Septic costs in Georgia run close to the national averages but are usually slightly lower. Pumping typically falls between $280 and $545 in Georgia, averaging $410, compared with a national range of $290 to $565 and an average of $430. Full installation averages $7,220 in the state versus $7,500 nationally, and replacement averages $6,260 versus $6,500. Inspections, maintenance and repairs also come in slightly below national figures. Get written estimates from at least two providers, since final prices depend on tank size, access and soil conditions.

ServiceIn GeorgiaNational
Septic Tank Pumping Cost $280 – $545 $290 – $565 -5%
Septic Tank Installation Cost $3,370 – $11,555 $3,500 – $12,000 -4%
Septic Tank Maintenance $290 – $480 $300 – $500 -4%
Septic Tank Inspection $195 – $865 $200 – $900 -4%
Septic Tank Replacement Cost $2,890 – $9,630 $3,000 – $10,000 -4%
Septic Tank Cost $280 – $545 $290 – $565 -5%
Septic Tank Cleaning Cost $290 – $675 $300 – $700 -5%
Septic Tank Repair Cost $625 – $2,890 $650 – $3,000 -4%
Drain Field $2,890 – $14,445 $3,000 – $15,000 -4%
Aerobic Septic System $195 – $580 $200 – $600 -4%

Typical ranges: national prices adjusted to the cost of living in Georgia (BEA regional price parities). Your quote depends on your property.

Use the cost calculator

Septic Tank services in Georgia: FAQ

septic tank permit Georgia

A septic permit in Georgia is issued by your County Board of Health, not the state directly. You must receive a construction permit before installing, repairing or replacing a system, and it remains valid for up to twelve months. Contact your county environmental health office to start the site evaluation.

Georgia septic license

Septic installers, pumpers and maintenance contractors in Georgia must be certified under DPH Chapter 511-3-1. Contractors must be at least 18 and pass the residential or pumper exam with a score of at least 70. Companies must employ at least one certified contractor, and pumping companies also need a current septage removal permit.

septic license Georgia

Georgia does not license homeowners to work on their own septic systems in the same way it certifies contractors, but any company you hire for installation, pumping or maintenance should hold the appropriate DPH certification. Ask for proof of certification and confirm it is current before signing an agreement.

Get free quotes