| Who regulates | <cite index='2-3'>Septic installations are approved under ADEQ's Aquifer Protection Permit (APP) General Permit program</cite>, and <cite index='1-3'>some counties, such as Santa Cruz, manage conventional septic permits while other permit types go directly to ADEQ</cite>. | legacy.azdeq.gov |
| General permit scope | <cite index='3-2,3-6'>The Type 4.02–4.23 General Permit covers septic systems with flows from 0 to 24,000 gallons per day and is valid for the life of the facility</cite>. | azdeq.gov |
| Sale inspection | <cite index='11-4,11-2'>The seller must hire a qualified inspector to perform the transfer inspection within six months before the property transfers. It is triggered by resale of the home, either by the owner or through a real estate professional</cite>. | azdeq.gov |
| Inspection report | <cite index='11-5,11-7'>The inspector prepares a Report of Inspection (ROI) for the seller, and the seller gives the buyer the completed ROI plus any permitting, operation and maintenance documents the seller has</cite>. <cite index='11-6'>The ROI is not filed with ADEQ</cite>. | azdeq.gov |
| Notice of Transfer | <cite index='11-8'>Within 15 calendar days after the property transfers, the buyer must submit a completed Notice of Transfer (NOT) form to the proper agency</cite>. <cite index='12-8'>Maricopa County's NOT fee is $60</cite>. <cite index='1-8'>Santa Cruz County lists $70</cite>. Fees therefore vary by agency, so check with your county. | maricopa.gov |
| Contract cannot waive inspection | <cite index='12-3'>The six-month inspection requirement is an Arizona rule and takes precedence over any conflicting terms in the property transfer contract</cite>. | maricopa.gov |
| New-system exception | <cite index='19-3'>The only exception to the transfer inspection is when the system is new and was not used before the property was sold</cite>. | extension.arizona.edu |
| Who may inspect | <cite index='43-7,43-8,43-9'>University of Arizona Extension lists qualifying inspectors as an Arizona-registered engineer, an Arizona-registered sanitarian, or an owner (or employee) of an ADEQ-licensed septage-hauling vehicle (a pumper)</cite>. <cite index='42-2'>ADEQ's form also lists a wastewater treatment operator certified by ADEQ</cite>. The rule is A.A.C. R18-9-A316, and I could not confirm the full current list from the rule text itself. | extension.arizona.edu |
| Setback to wells and property lines | <cite index='22-11,22-12'>Under R18-9-A312.C, septic systems must be 100 feet from wells</cite>. <cite index='22-1'>Adjoining parcels without a common drinking water system require a 50-foot setback to the property line. It can be reduced to 5 feet with a properly recorded Affidavit of Agreement to Encroach</cite>. | content.govdelivery.com |
| Other setbacks | <cite index='28-1'>A secondary summary of R18-9-A312(C) Table 1 lists 10 ft from a building and 100 ft from a stream, lake, reservoir or canal high-water line</cite>. I did not verify these figures against the rule text, so confirm them with your county or ADEQ. | build-your-house.com |
| Alternative setbacks | <cite index='25-8,25-12'>Applicants may request a reduced setback for conventional or alternative systems when submitting the Notice of Intent (NOI), and approval is at ADEQ's discretion</cite>. | static.azdeq.gov |
| Pumping and maintenance | <cite index='41-4,41-5'>Maricopa County's maintenance guidance says to clean the effluent filter at least once a year and pump the tank every 3 to 5 years, using a licensed professional pumping company</cite>. A non-official source says <cite index='44-2'>no state law mandates a specific pumping frequency</cite>. I did not find an official statewide interval. | maricopa.gov |
| Pumping at sale | <cite index='41-9'>Maricopa County guidance says the tank shall be pumped at the time of sale, unless a licensed professional certifies that pumping is not necessary</cite>. | maricopa.gov |
| Design flow and engineering | <cite index='6-3'>Facilities of 3,000 to 24,000 gallons per day need design documents and a performance assurance plan sealed by an Arizona-registered professional engineer</cite>. That is mostly relevant to larger or commercial systems. | greenlee.az.gov |