| Who regulates | DEM's OWTS Program administers the state septic permitting program, and DEM has records of most septic permits from 1968 to the present. Contact is 401-222-3961 or DEM.OWTS@dem.ri.gov. | dem.ri.gov |
| Coastal areas | Any OWTS installation, repair, modification or replacement within the Coastal Resources Management Council (CRMC) jurisdiction needs a CRMC permit as well as DEM approval. | crmc.ri.gov |
| Design and installation | A DEM-licensed designer must design the system and a DEM-licensed installer must install it. New systems need a Class II or III designer, and Class I designers may only design repairs. | dem.ri.gov |
| Inspections during installation | DEM staff conduct field inspections at key stages of siting and installation. When installation is complete, the designer must certify to DEM that the system was built as designed and meets the OWTS rules, and the system may then be used. | dem.ri.gov |
| Sale of property: cesspools | Any cesspool serving a building that is sold or transferred must be removed and replaced with an OWTS, or the building must be connected to public sewer, within 12 months of the sale or transfer. If the wastewater disposal method is unknown, a system inspector must inspect before the sale or transfer to see whether a cesspool is present. | law.justia.com |
| Sale of property: buyer inspection period | Purchase and sale contracts for property that is or may be served by a private cesspool must give buyers a 10-day period, unless the parties agree otherwise, to inspect the onsite sewage system. If the contract omits this provision or previous inspection results are not provided, the buyer may void the agreement by written notice before closing. | lawserver.com |
| Setbacks | DEM's commonly cited setbacks are 100 ft from a private well to the leach field, 75 ft from a well to the septic tank, 10 ft from the leach field to the property line, 5 ft from decks to the tank or leach field, and 25 ft from an in-ground pool to the leach field. The full table is in Rule 6.23, and variances need prior DEM approval. | dem.ri.gov |
| Pumping and maintenance | The rules list pumping a cesspool or septic tank more than two times per year among the conditions of a failed or malfunctioning system. Pumping must be done by a DEM-permitted septage transporter. I did not find a statewide rule requiring pumping at a fixed interval. A secondary source reports that DEM says most systems need pumping every 2 to 5 years. | risos-apa-production-public.s3.amazonaws.com |
| Renovations and added bedrooms | Adding bedrooms beyond what the system was approved for requires a Class II or III designer and a DEM alteration or new-construction permit. Septic systems are sized using a daily flow figure based on the number of bedrooms. | dem.ri.gov |
| Town rules | Some towns add their own requirements on top of the state rules. For example, Portsmouth's wastewater management district sets pump-out and inspection schedules and requires annual inspection of holding tanks. | ecode360.com |