| Who regulates | All onsite systems must be installed and operated under 19 CSR 20-3.060 (construction) and 19 CSR 20-3.015 (operation), the manufacturer's specifications, and the designer's operation and maintenance manual. | health.mo.gov |
| Local administration | The 'administrative authority' that adopts and enforces the standards can be a county health department, planning and zoning commission, county building department, sewer district, municipality or the state health department. | regulations.justia.com |
| Permit exemption (3+ acres) | Lots of 3 acres or more are excluded if the entire system is more than 10 feet from the property line and no effluent enters an adjoining property or contaminates a water supply (determined by dye tracing). This exclusion does not apply to lots adjacent to lakes operated by the Corps of Engineers or a public utility. | camdencountymo.gov |
| Setbacks | Minimum setbacks in feet (sewage tank / soil treatment system / lagoon): private well 50/100/100; classified stream, lake or pond 50/50/50; property lines 10/10/75, with 100 feet for the lagoon overflow. | health.mo.gov |
| More setbacks | The state table also lists a public water supply well at 300 feet for tank, field and lagoon, a cistern at 25 feet, and a spring at 50 feet (tank) and 100 feet (field and lagoon). | health.mo.gov |
| Design requirements | Serial and drop-box systems must not be used, and systems should be designed with a high water alarm and light signal. | law.cornell.edu |
| Malfunctioning systems | Under Missouri law, malfunctioning systems must be remediated, repaired or replaced to the standards in 19 CSR 20-3.060. | health.mo.gov |
| Operation / maintenance | Systems must be operated and maintained so that they do not cause surfacing or discharging effluent, odors, insect breeding habitat, surface or groundwater contamination, or a nuisance or health hazard. I found no official state-mandated pumping interval, so check your county's rules. | health.mo.gov |
| Inspection at property sale | I found no official state rule requiring a septic inspection at sale. Secondary sources say neither Missouri statutes nor the Camden County ordinance require one. Some counties differ: Stone County has an ordinance requiring an inspection in some instances as part of a property transfer certificate, and lenders often ask for one. Verify with the county. | propcash.co |
| Who can inspect for a sale | Inspectors must complete the University of Missouri inspector's course, and completing the registered installer course is a prerequisite. | health.mo.gov |
| Example county permit fees (Cole County) | Cole County charges $400 for new construction, $250 for a lagoon with septic tank, and $150 for repair to an existing system. Fees vary by county. | colecounty.org |
| Approved tanks | I did not find an official statewide 'approved septic tank' list. A county ordinance that follows the state rule says tanks must be concrete or another material approved by the Department and meet 19 CSR 20-3.060 criteria. Confirm tank approval with your permitting office. | ecode360.com |