| Who regulates | MDE's Onsite Systems Division gives technical direction to County Health Departments and Local Approving Authorities that run the delegated programs for onsite sewage disposal systems and wells. | mde.maryland.gov |
| Permit required (state code) | Under COMAR 26.04.02.03, no one may build an on-site sewage disposal system, or alter one or increase its flow, without first getting a permit from the Approving Authority. | regs.maryland.gov |
| Statewide application portal | Any owner who wants a septic system installed, or needs an existing system repaired, must get a Septic System Construction Permit, and the MDE online portal says a county land (soil) evaluation must be completed before applying. | onestop.md.gov |
| Setback: wells | COMAR 26.04.02.04J and 26.04.02.05B require the septic system and its recovery area to be at least 100 feet from a water well in an unconfined aquifer and 50 feet from a well in a confined aquifer. | mdrules.elaws.us |
| Other setbacks | COMAR 26.04.02.04J also sets 100 feet from springs, 100 feet from non-potable water bodies including streams, 100 feet from karst sinkholes, 25 feet from drainage ways, flood plain soils, rock outcrops and steep slopes (>25%), and 10 feet from building foundations. | mdrules.elaws.us |
| Local setback example (Howard County) | Howard County's published setback sheet lists 100 feet from a well to the septic system if the well is not down-gradient and 200 feet if it is down-gradient, which needs Health and MDE variance approval, plus 10 feet from the septic tank to a house without a basement. | howardcountymd.gov |
| Pumping and maintenance | COMAR 26.04.02.03K requires each construction permit to state that MDE recommends pumping septic tanks, BAT and other pretreatment units often enough that solids do not reach the disposal area; I found no statewide mandatory pumping interval for conventional systems in the official sources. | regs.maryland.gov |
| Nitrogen-removing (BAT) systems | MDE's 2016 rule change lets conventional systems be installed outside the Critical Area for new construction, while BAT is still required for large systems of 5,000 gallons per day or more; the Anne Arundel County Health Department says BAT is required for all new and replacement systems in the Critical Area. | mde.maryland.gov |
| Bay Restoration Fee | Since July 1, 2012, MDE has collected a $60 annual fee from each user served by an onsite system to fund BAT upgrades, with priority given to failing systems in Critical Areas. | mde.maryland.gov |
| Property-sale inspection | MDE says anyone performing a property transfer inspection of an on-site septic system must be registered with the State Board of On-Site Wastewater Professionals; whether an inspection is required at sale varies by county, and unofficial real-estate sources list Anne Arundel, Baltimore, Carroll, Frederick, Harford and Queen Anne's counties as requiring one, so confirm with your county health department. | mde.maryland.gov |